On blasting construction technique of Hulu station in the second double line along Jining-Baotou railway
Nan Yu-gan
Abstract
Nan Yu-gan
Abstract
The paper introduces the blasting construction technique of Hulu station in the second double line along Jining to Baotou railway,illustrates the blasting construction procedure,the identification of the safe distance,and the safety guarantee measures,and indicates the safety protection scheme,so as to provide the direction for the similar blasting projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper introduces the blasting construction technique of Hulu station in the second double line along Jining to Baotou railway,illustrates the blasting construction procedure,the identification of the safe distance,and the safety guarantee measures,and indicates the safety protection scheme,so as to provide the direction for the similar blasting projects.
Key concepts: Rock blasting, Engineering, Railway line, Line (geometry), Identification (biology), Forensic engineering, Civil engineering, Mining engineering