On the Unified Model of Geological Disaster Training and Port Wharf Construction in Three Gorges Reservoir
Xiao Sheng-xie
Abstract
Xiao Sheng-xie
Abstract
This paper discusses the unified model of geological disaster training and port terminal construction in Three Gorges Reservoir, puts forward the unified loading model about wharf structure and protective structure, and approaches the computation principle and procedure of the unified model of geological disaster training and wharf construction, so as to provide a basis for the unification of geological disaster training and port wharf construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper discusses the unified model of geological disaster training and port terminal construction in Three Gorges Reservoir, puts forward the unified loading model about wharf structure and protective structure, and approaches the computation principle and procedure of the unified model of geological disaster training and wharf construction, so as to provide a basis for the unification of geological disaster training and port wharf construction.
Key concepts: Wharf, Three gorges, Port (circuit theory), Civil engineering, Unification, Training (meteorology), Engineering, Construction engineering