2009•Mining & Processing EquipmentRequires access

Application of ABB DTC inverter & Siemens S7-300 PLC in the mine hoist speed control system

Lin Baosong

Open publisher page 0 citations

Abstract

Using the traditional cam controller, relay and contactor control, the original hoist exchange control system is running in high power consumption, high noise, poor safety performance and frequent maintenance. In order to ensure this system in safety, stability and high efficiency, the Swedish ABB's ACS800 DTC (Direct Torque Control) inverter is to replace the traditional analog electronic control system, combined with Siemens S7-300 PLC (programmable logic-controller) as the system logic control. And thus the system realizes the working semi-automation, increases the productivity and achieves the energy-saving economic operation.

About this research paper

What this paper is about

Using the traditional cam controller, relay and contactor control, the original hoist exchange control system is running in high power consumption, high noise, poor safety performance and frequent maintenance. In order to ensure this system in safety, stability and high efficiency, the Swedish ABB's ACS800 DTC (Direct Torque Control) inverter is to replace the traditional analog electronic control system, combined with Siemens S7-300 PLC (programmable logic-controller) as the system logic control. And thus the system realizes the working semi-automation, increases the productivity and achieves the energy-saving economic operation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Using the traditional cam controller, relay and contactor control, the original hoist exchange control system is running in high power consumption, high noise, poor safety performance and frequent maintenance. In order to ensure this system in safety, stability and high efficiency, the Swedish ABB's ACS800 DTC (Direct Torque Control) inverter is to replace the traditional analog electronic control system, combined with Siemens S7-300 PLC (programmable logic-controller) as the system logic control. And thus the system realizes the working semi-automation, increases the productivity and achieves the energy-saving economic operation.

Key concepts: Siemens, Hoist (device), Inverter, Engineering, Programmable logic controller, Control system, Control engineering, Automation

Related papers

Back to paper searchBrowse research topicsOriginal source
Application of ABB DTC inverter & Siemens S7-300 PLC in the mine hoist speed control system — Research Paper | ScholarLens