On construction craft of anti-slide pile and quality control measures
Wang Cai-ya
Abstract
Wang Cai-ya
Abstract
Taking the foundation project of F contract section along Chengdu-Chongqing expressway's double track(Chongqing borders)as the example,the paper from the construction craft procedures,introduces the construction craft of anti-slide pile and its operation points in all steps,and illustrates the quality control measures,so as to accumulate the precious experience for the side slope treatment projects on similar roads.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking the foundation project of F contract section along Chengdu-Chongqing expressway's double track(Chongqing borders)as the example,the paper from the construction craft procedures,introduces the construction craft of anti-slide pile and its operation points in all steps,and illustrates the quality control measures,so as to accumulate the precious experience for the side slope treatment projects on similar roads.
Key concepts: Craft, Pile, Foundation (evidence), Quality (philosophy), Control (management), Section (typography), Engineering, Track (disk drive)