2010•Science Technology and EngineeringRequires access

Research of Remain Oil Distribution and Horizontal Well Development Adjustment for Heavy Oil Reservoirs with Bottom WaterATER

Yang Jie

Open publisher page 0 citations

Abstract

QHD32-6 oilfield west area NmⅡ1 sand is heavy oil reservoir with bottom water.NmⅡ1 sand now comes into high water cut period after 5 years development.Firstly,NmⅡ1 sand water conning law is analyzed through production performance and production logging.And then remain oil distribution is researched after description of reservoir and reservoir simulation.Third,the pilot horizontal well is drilled at remain oil concentration area,and the pilot horizontal well is high production and low water cut.Test production show research result of remain oil distribution is veritable.Lastly the development program of horizontal wells infill NmⅡ1 sand wholeness is proposed.The production history shows NmⅡ1 sand development adjustment is successful,and provides production experience for same reservoirs.

About this research paper

What this paper is about

QHD32-6 oilfield west area NmⅡ1 sand is heavy oil reservoir with bottom water.NmⅡ1 sand now comes into high water cut period after 5 years development.Firstly,NmⅡ1 sand water conning law is analyzed through production performance and production logging.And then remain oil distribution is researched after description of reservoir and reservoir simulation.Third,the pilot horizontal well is drilled at remain oil concentration area,and the pilot horizontal well is high production and low water cut.Test production show research result of remain oil distribution is veritable.Lastly the development program of horizontal wells infill NmⅡ1 sand wholeness is proposed.The production history shows NmⅡ1 sand development adjustment is successful,and provides production experience for same reservoirs.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

QHD32-6 oilfield west area NmⅡ1 sand is heavy oil reservoir with bottom water.NmⅡ1 sand now comes into high water cut period after 5 years development.Firstly,NmⅡ1 sand water conning law is analyzed through production performance and production logging.And then remain oil distribution is researched after description of reservoir and reservoir simulation.Third,the pilot horizontal well is drilled at remain oil concentration area,and the pilot horizontal well is high production and low water cut.Test production show research result of remain oil distribution is veritable.Lastly the development program of horizontal wells infill NmⅡ1 sand wholeness is proposed.The production history shows NmⅡ1 sand development adjustment is successful,and provides production experience for same reservoirs.

Key concepts: Infill, Petroleum engineering, Water cut, Oil production, Bottom water, Geology, Distribution law, Directional drilling

Related papers

Back to paper searchBrowse research topicsOriginal source
Research of Remain Oil Distribution and Horizontal Well Development Adjustment for Heavy Oil Reservoirs with Bottom WaterATER — Research Paper | ScholarLens