2010•Chinese Journal of Geotechnical EngineeringRequires access

Calculation of horizontal displacement of soil nailing considering construction process

Zhaoyuan Chen

Open publisher page 2 citations

Abstract

Based on the construction feature that staged construction completes after each of the excavation stages is finished,it is important to discuss the incremental force of soil nail during the construction.A new phenomenological model for the analysis of soil nailing during the excavation is established.Based on the new model,the methods for the tensile forces of soil nail and the horizontal displacements of the wall facing considering the construction process can be obtained.The measurements of horizontal displacement of wall facing of Experiment 1 of Clouterre Program during the construction are compared with the calculated results by the proposed methods.The analysis of excavation depths,slope angles,soil properties and nail bars shows that the proposed method is available.

About this research paper

What this paper is about

Based on the construction feature that staged construction completes after each of the excavation stages is finished,it is important to discuss the incremental force of soil nail during the construction.A new phenomenological model for the analysis of soil nailing during the excavation is established.Based on the new model,the methods for the tensile forces of soil nail and the horizontal displacements of the wall facing considering the construction process can be obtained.The measurements of horizontal displacement of wall facing of Experiment 1 of Clouterre Program during the construction are compared with the calculated results by the proposed methods.The analysis of excavation depths,slope angles,soil properties and nail bars shows that the proposed method is available.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the construction feature that staged construction completes after each of the excavation stages is finished,it is important to discuss the incremental force of soil nail during the construction.A new phenomenological model for the analysis of soil nailing during the excavation is established.Based on the new model,the methods for the tensile forces of soil nail and the horizontal displacements of the wall facing considering the construction process can be obtained.The measurements of horizontal displacement of wall facing of Experiment 1 of Clouterre Program during the construction are compared with the calculated results by the proposed methods.The analysis of excavation depths,slope angles,soil properties and nail bars shows that the proposed method is available.

Key concepts: Soil nailing, Excavation, Geotechnical engineering, Displacement (psychology), Nail (fastener), Engineering, Structural engineering, Vertical displacement

Related papers

Back to paper searchBrowse research topicsOriginal source
Calculation of horizontal displacement of soil nailing considering construction process — Research Paper | ScholarLens