On demolition technique in flyover with spanning railway on Fukang road
LI Chang-cu
Abstract
LI Chang-cu
Abstract
By combining with the factual examples,the paper introduces the demolition construction craft,construction key points and relative safety measures of in flyover with spanning railway on Fukang road,so as to accumulate experience for similar projects,and ensure the safe traffic on the railway.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
By combining with the factual examples,the paper introduces the demolition construction craft,construction key points and relative safety measures of in flyover with spanning railway on Fukang road,so as to accumulate experience for similar projects,and ensure the safe traffic on the railway.
Key concepts: Demolition, Craft, Transport engineering, Engineering, Forensic engineering, Computer science, Civil engineering, Geography