Construction technology of changing the original rail track into speed-raising turnout
Yuli Ma
Abstract
Yuli Ma
Abstract
Taking the example of changing the original rail track of Huangheya stop and Santang stop of Beijing-Shanghai railway into GLC(06)01 speed-raising turnout,it elaborates the construction technology of speed-raising turnout replacing from the first-phase turnout surveying and positioning,turnout pre-paving,construction procedures of key construction before low-speed running,in low-speed running,and after sealing,and elaborates the construction technology of speed-raising turnout replacing,which provides a reference for relevant projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking the example of changing the original rail track of Huangheya stop and Santang stop of Beijing-Shanghai railway into GLC(06)01 speed-raising turnout,it elaborates the construction technology of speed-raising turnout replacing from the first-phase turnout surveying and positioning,turnout pre-paving,construction procedures of key construction before low-speed running,in low-speed running,and after sealing,and elaborates the construction technology of speed-raising turnout replacing,which provides a reference for relevant projects.
Key concepts: Turnout, Raising (metalworking), Track (disk drive), Beijing, Engineering, Key (lock), Transport engineering, Computer science