2012Safety in Coal MinesRequires access

Feasibility Analysis of Coal Mine Safety Mining Under Water Body

Quangui Li

Open publisher page 0 citations

Abstract

Aiming at the problem of mining No.3 coal under plash caused by surface subsidence of a coal mine in Shandong,the paper analyzes the amount of surface subsidence caused by coal mining.The development height of two belts in No.3 coal mine is measured by using double end water blocking device technology.Compared with the theoretical values and UDEC simulation values,the height of water flowing fractured zone is determined as 47.75 m,the safety height of waterproof coal pillar in No.3 coal mine is 70 m.Using FLAC software,the paper simulates the water threat degrees of different gas faults in the remaining different coal pillar widths.The results show that the coal mine can be carried out safety mining under water area.

About this research paper

What this paper is about

Aiming at the problem of mining No.3 coal under plash caused by surface subsidence of a coal mine in Shandong,the paper analyzes the amount of surface subsidence caused by coal mining.The development height of two belts in No.3 coal mine is measured by using double end water blocking device technology.Compared with the theoretical values and UDEC simulation values,the height of water flowing fractured zone is determined as 47.75 m,the safety height of waterproof coal pillar in No.3 coal mine is 70 m.Using FLAC software,the paper simulates the water threat degrees of different gas faults in the remaining different coal pillar widths.The results show that the coal mine can be carried out safety mining under water area.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Aiming at the problem of mining No.3 coal under plash caused by surface subsidence of a coal mine in Shandong,the paper analyzes the amount of surface subsidence caused by coal mining.The development height of two belts in No.3 coal mine is measured by using double end water blocking device technology.Compared with the theoretical values and UDEC simulation values,the height of water flowing fractured zone is determined as 47.75 m,the safety height of waterproof coal pillar in No.3 coal mine is 70 m.Using FLAC software,the paper simulates the water threat degrees of different gas faults in the remaining different coal pillar widths.The results show that the coal mine can be carried out safety mining under water area.

Key concepts: Coal mining, Mining engineering, Coal, Subsidence, Longwall mining, Pillar, Geology, Problems in coal mining

Related papers

Back to paper searchBrowse research topicsOriginal source
Feasibility Analysis of Coal Mine Safety Mining Under Water Body — Research Paper | ScholarLens