Laying railway turnout construction and technical control for existing transformation blockade
LI Guang-f
Abstract
LI Guang-f
Abstract
Taking Baotou east station existing transformation project as the case,it describes laying railway turnout construction technique for existing transformation blockade,respectively expounds the construction methods including construction orders,turnout prefabricated,changing ballast,turnout insertion and so on,and puts forward corresponding technical controlling measures,which has guiding significance for future similar existing railway line transformation project.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking Baotou east station existing transformation project as the case,it describes laying railway turnout construction technique for existing transformation blockade,respectively expounds the construction methods including construction orders,turnout prefabricated,changing ballast,turnout insertion and so on,and puts forward corresponding technical controlling measures,which has guiding significance for future similar existing railway line transformation project.
Key concepts: Turnout, Ballast, Transformation (genetics), Laying, Engineering, Transport engineering, Construction engineering, Architectural engineering