2010•Electric Power TechnologyRequires access

The Peak Load Regulation of Nuclear Power Plants in Guangdong Power Grid

Sun Jing-qiang

Open publisher page 3 citations

Abstract

Guangdong is lack of primary energy,and the development of nuclear power plants is an inevitable choice for the security of energy supply.It is estimated that the installed capacity of nuclear power plants in Guangdong will be about 30000MW by the year of 2020.Based on Power System Planning,a peaking balance analysis is conducted.The result reveals that there is peaking gap both in 2015 and 2020.After a detailed discussion of the load following ability of nuclear power plants,the conclusion is reached that nuclear power plants will participate peak load regulation by week in 2015 and day by day in 2020.

About this research paper

What this paper is about

Guangdong is lack of primary energy,and the development of nuclear power plants is an inevitable choice for the security of energy supply.It is estimated that the installed capacity of nuclear power plants in Guangdong will be about 30000MW by the year of 2020.Based on Power System Planning,a peaking balance analysis is conducted.The result reveals that there is peaking gap both in 2015 and 2020.After a detailed discussion of the load following ability of nuclear power plants,the conclusion is reached that nuclear power plants will participate peak load regulation by week in 2015 and day by day in 2020.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Guangdong is lack of primary energy,and the development of nuclear power plants is an inevitable choice for the security of energy supply.It is estimated that the installed capacity of nuclear power plants in Guangdong will be about 30000MW by the year of 2020.Based on Power System Planning,a peaking balance analysis is conducted.The result reveals that there is peaking gap both in 2015 and 2020.After a detailed discussion of the load following ability of nuclear power plants,the conclusion is reached that nuclear power plants will participate peak load regulation by week in 2015 and day by day in 2020.

Key concepts: Nuclear power, Peak load, Base load power plant, Power grid, Power (physics), Nuclear engineering, Nuclear power plant, Load following power plant

Related papers

Back to paper searchBrowse research topicsOriginal source
The Peak Load Regulation of Nuclear Power Plants in Guangdong Power Grid — Research Paper | ScholarLens