Calculation of Settlement of Composite Foundation with Rigid Piles under Flexible Ground
Zhao Guie
Abstract
Zhao Guie
Abstract
Through further discussed on mechanism of the length-pile composite foundation,according to the interaction of the characteristic of pile,soil and cushion in length-pile composite foundation,introducing the Mylonakis Gazetas piles and piles,the pile and soil interaction model on the basis of shear displacement method,considering effect of the cushion layer,export the flexibility ration of the length pile composite foundation when calculating the interaction coefficient.A new method of computation of settlement were put forward by comprehensive consideration of pile-oil-cushion system when joint action in composite foundation,and aslo work out a corresponding calculation program.Finally carry on the analysis for a project example by this method,the calculated value is neatly dovetails.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Through further discussed on mechanism of the length-pile composite foundation,according to the interaction of the characteristic of pile,soil and cushion in length-pile composite foundation,introducing the Mylonakis Gazetas piles and piles,the pile and soil interaction model on the basis of shear displacement method,considering effect of the cushion layer,export the flexibility ration of the length pile composite foundation when calculating the interaction coefficient.A new method of computation of settlement were put forward by comprehensive consideration of pile-oil-cushion system when joint action in composite foundation,and aslo work out a corresponding calculation program.Finally carry on the analysis for a project example by this method,the calculated value is neatly dovetails.
Key concepts: Cushion, Pile, Settlement (finance), Composite number, Foundation (evidence), Geotechnical engineering, Structural engineering, Engineering