2004•Power Station Auxiliary EquipmentRequires access

Improvement of the Automatic Control System of Cold & Hot Air of the Pulverizer for 600MW Unit in No. 3 Harbin Power Plant

Xiaofeng Cui

Open publisher page 0 citations

Abstract

The automatic contol system of cold hot air of the pulverizer for 600MW unit has poorly been operating since it was put into service in No. 3 Harbin Power Plant. The forward - feeding, the coupling - off coefficient and the load tracing function of the automatic regulation system were modified after having been analyzed theoretically and systematically, After modification, the system has smoothly operated with satisfactory performance.

About this research paper

What this paper is about

The automatic contol system of cold hot air of the pulverizer for 600MW unit has poorly been operating since it was put into service in No. 3 Harbin Power Plant. The forward - feeding, the coupling - off coefficient and the load tracing function of the automatic regulation system were modified after having been analyzed theoretically and systematically, After modification, the system has smoothly operated with satisfactory performance.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The automatic contol system of cold hot air of the pulverizer for 600MW unit has poorly been operating since it was put into service in No. 3 Harbin Power Plant. The forward - feeding, the coupling - off coefficient and the load tracing function of the automatic regulation system were modified after having been analyzed theoretically and systematically, After modification, the system has smoothly operated with satisfactory performance.

Key concepts: Pulverizer, Tracing, Engineering, Power (physics), Automotive engineering, Power station, Mechanical engineering, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Improvement of the Automatic Control System of Cold & Hot Air of the Pulverizer for 600MW Unit in No. 3 Harbin Power Plant — Research Paper | ScholarLens