Optimal design of diversion tunnel section for Dajinping hydropower project on the Songlin River

Tian Li

Open publisher page 0 citations

Abstract

Dajinping project is a diversion type hydropower project planned on the Songlin River trunk,the geological conditions along its tunnel are complicated.During early construction,the tunnel is excavated as circular section arch at the first stage.According to the geologic conditions of surrounding rocks exposed by excavation and the requirements of later construction progress,the design section is optimized under the condition that the tunnel layout,design discharge and unit output will not be changed so as to ensure the stable and safe operation of the project.For tunnel sections with good surrounding rocks,the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.The above method is convenient and practical and satisfies the accuracy requirement.Along with the construction of middle and small-sized hydropower projects,the optimal design can be used as a simple and easy concept to timely adjust the section form during tunnel construction.

About this research paper

What this paper is about

Dajinping project is a diversion type hydropower project planned on the Songlin River trunk,the geological conditions along its tunnel are complicated.During early construction,the tunnel is excavated as circular section arch at the first stage.According to the geologic conditions of surrounding rocks exposed by excavation and the requirements of later construction progress,the design section is optimized under the condition that the tunnel layout,design discharge and unit output will not be changed so as to ensure the stable and safe operation of the project.For tunnel sections with good surrounding rocks,the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.The above method is convenient and practical and satisfies the accuracy requirement.Along with the construction of middle and small-sized hydropower projects,the optimal design can be used as a simple and easy concept to timely adjust the section form during tunnel construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Dajinping project is a diversion type hydropower project planned on the Songlin River trunk,the geological conditions along its tunnel are complicated.During early construction,the tunnel is excavated as circular section arch at the first stage.According to the geologic conditions of surrounding rocks exposed by excavation and the requirements of later construction progress,the design section is optimized under the condition that the tunnel layout,design discharge and unit output will not be changed so as to ensure the stable and safe operation of the project.For tunnel sections with good surrounding rocks,the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.The above method is convenient and practical and satisfies the accuracy requirement.Along with the construction of middle and small-sized hydropower projects,the optimal design can be used as a simple and easy concept to timely adjust the section form during tunnel construction.

Key concepts: Excavation, Hydropower, Section (typography), Arch, Civil engineering, Engineering, Geotechnical engineering, Tunnel construction

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimal design of diversion tunnel section for Dajinping hydropower project on the Songlin River — Research Paper | ScholarLens