Key problems in Penglai Jutao 50 000 DWT slideway construction and wharf renovation
Qian Wan
Abstract
Qian Wan
Abstract
Concerning Penglai Jutao No.1 slideway construction,this paper analyzes the construction schemes from the construction l difficulty degree,structure force,pile foundation test and engineering cost,etc.,summarizes the advantages and disadvantages of the schemes,discusses problems encountered during the transformation of the gravity caisson wharf to the marine heavy wharf and countermeasures to serve as a reference for similar engineering.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Concerning Penglai Jutao No.1 slideway construction,this paper analyzes the construction schemes from the construction l difficulty degree,structure force,pile foundation test and engineering cost,etc.,summarizes the advantages and disadvantages of the schemes,discusses problems encountered during the transformation of the gravity caisson wharf to the marine heavy wharf and countermeasures to serve as a reference for similar engineering.
Key concepts: Wharf, Caisson, Foundation (evidence), Engineering, Civil engineering, Pile, Construction engineering, Sheet pile