Key Techniques for Incremental Launching of Long Span and Long Continuous Unit Steel Truss Girder

Yao Fa-hai

Open publisher page 0 citations

Abstract

The main bridge of Zhengzhou Huanghe River Rail-cum-Road Bridge is arranged in two continuous units,of which the first unit is a six-pylon continuous composite steel truss girder cable-stayed bridge with span arrangement(120+5×168+120) m and the second unit is a continuous composite steel truss girder bridge with span arrangement(5×120) m.The first unit truss girder of the bridge was erected by the construction technique of multi-point,continuous and synchronous incremental launching and the MIDAS Civil software was used to conduct the calculation of the launching construction.In view of the reaction force and frictional force at the tops of the piers,2 sets of 350-t capacity continuous jacks were provided at each pier.The incremental launching distance of the long span and long continuous unit truss girder of the bridge was 1 080 m and the total launching weight was 27 000 t.The side trusses were launched positively while the middle truss was moved passively and the technique of the multi-point,continuous and dynamic control of computer was applied.The launching nose structure and the main steel truss girder were transformed form the inclined trusses into the straight ones via the connection points of the structure and the girder.The slipway was arranged by the side of the piers and the system of the slip blocks was transformed by the jacks installed at the front end of the slipway to finally satisfy the force condition requirements of the truss girder structure.

About this research paper

What this paper is about

The main bridge of Zhengzhou Huanghe River Rail-cum-Road Bridge is arranged in two continuous units,of which the first unit is a six-pylon continuous composite steel truss girder cable-stayed bridge with span arrangement(120+5×168+120) m and the second unit is a continuous composite steel truss girder bridge with span arrangement(5×120) m.The first unit truss girder of the bridge was erected by the construction technique of multi-point,continuous and synchronous incremental launching and the MIDAS Civil software was used to conduct the calculation of the launching construction.In view of the reaction force and frictional force at the tops of the piers,2 sets of 350-t capacity continuous jacks were provided at each pier.The incremental launching distance of the long span and long continuous unit truss girder of the bridge was 1 080 m and the total launching weight was 27 000 t.The side trusses were launched positively while the middle truss was moved passively and the technique of the multi-point,continuous and dynamic control of computer was applied.The launching nose structure and the main steel truss girder were transformed form the inclined trusses into the straight ones via the connection points of the structure and the girder.The slipway was arranged by the side of the piers and the system of the slip blocks was transformed by the jacks installed at the front end of the slipway to finally satisfy the force condition requirements of the truss girder structure.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main bridge of Zhengzhou Huanghe River Rail-cum-Road Bridge is arranged in two continuous units,of which the first unit is a six-pylon continuous composite steel truss girder cable-stayed bridge with span arrangement(120+5×168+120) m and the second unit is a continuous composite steel truss girder bridge with span arrangement(5×120) m.The first unit truss girder of the bridge was erected by the construction technique of multi-point,continuous and synchronous incremental launching and the MIDAS Civil software was used to conduct the calculation of the launching construction.In view of the reaction force and frictional force at the tops of the piers,2 sets of 350-t capacity continuous jacks were provided at each pier.The incremental launching distance of the long span and long continuous unit truss girder of the bridge was 1 080 m and the total launching weight was 27 000 t.The side trusses were launched positively while the middle truss was moved passively and the technique of the multi-point,continuous and dynamic control of computer was applied.The launching nose structure and the main steel truss girder were transformed form the inclined trusses into the straight ones via the connection points of the structure and the girder.The slipway was arranged by the side of the piers and the system of the slip blocks was transformed by the jacks installed at the front end of the slipway to finally satisfy the force condition requirements of the truss girder structure.

Key concepts: Truss, Structural engineering, Girder, Engineering, Bridge (graph theory), Span (engineering), Beam bridge, Box girder

Related papers

Back to paper searchBrowse research topicsOriginal source
Key Techniques for Incremental Launching of Long Span and Long Continuous Unit Steel Truss Girder — Research Paper | ScholarLens