Abstract

It is difficult to build traverse channel between two shield tunnels. Before the traverse channel is constructed, part of shield tunnel segments must be taken off to easily cause the shield tunnel segment to have superfluous distortion. The 3-D FLAC numerical analysis program is used to analyze the mechanics behavior of traverse channel construction, the shield tunnels segments distortion and surrounding stratum settlement induced by traverse channel construction are especially discussed in detail. The numerical simulation result provides the criteria for the establishment of assistant safety measures in construction.

About this research paper

What this paper is about

It is difficult to build traverse channel between two shield tunnels. Before the traverse channel is constructed, part of shield tunnel segments must be taken off to easily cause the shield tunnel segment to have superfluous distortion. The 3-D FLAC numerical analysis program is used to analyze the mechanics behavior of traverse channel construction, the shield tunnels segments distortion and surrounding stratum settlement induced by traverse channel construction are especially discussed in detail. The numerical simulation result provides the criteria for the establishment of assistant safety measures in construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It is difficult to build traverse channel between two shield tunnels. Before the traverse channel is constructed, part of shield tunnel segments must be taken off to easily cause the shield tunnel segment to have superfluous distortion. The 3-D FLAC numerical analysis program is used to analyze the mechanics behavior of traverse channel construction, the shield tunnels segments distortion and surrounding stratum settlement induced by traverse channel construction are especially discussed in detail. The numerical simulation result provides the criteria for the establishment of assistant safety measures in construction.

Key concepts: Traverse, Shield, Distortion (music), Channel (broadcasting), Stratum, Geotechnical engineering, Engineering, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Safety of Tunnels Structure and Stratum Stability in Construction of Traverse Channel between Two Shield Tunnels — Research Paper | ScholarLens