2005Journal of Highway and Transportation Research and DevelopmentRequires access

Regularity Analysis and Study on Excessive Pore Water Pressure during Jacked Pile of Pre-Ptressed Pipe Piles

Lei Jin-bo, XU Ze-zhong

Open publisher page 0 citations

Abstract

According to the control settlement theory,making use of the method of enlarging the piled spacing,PTC(pre-stressed concrete)piles with cap is designed and applied in the deep soft soil ground treatment of expressway.The applicability of PTC piles is discussed.The construction technology and technological requrrements are introduced,the spot observation of pore water pressure conducted during the PTC pile construction,the observation data analyzed.In order to avoid the compaction effect of excessive pore water pressure in the process of the PTC pile construction on the surroundings,some measures are put forward to eliminate the effect of pore water pressure.The advantageous conditions are analized and utilized during the dissipation of excessive pore water pressure,so the aim of secondary consolidation treatment will be materialized.

About this research paper

What this paper is about

According to the control settlement theory,making use of the method of enlarging the piled spacing,PTC(pre-stressed concrete)piles with cap is designed and applied in the deep soft soil ground treatment of expressway.The applicability of PTC piles is discussed.The construction technology and technological requrrements are introduced,the spot observation of pore water pressure conducted during the PTC pile construction,the observation data analyzed.In order to avoid the compaction effect of excessive pore water pressure in the process of the PTC pile construction on the surroundings,some measures are put forward to eliminate the effect of pore water pressure.The advantageous conditions are analized and utilized during the dissipation of excessive pore water pressure,so the aim of secondary consolidation treatment will be materialized.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to the control settlement theory,making use of the method of enlarging the piled spacing,PTC(pre-stressed concrete)piles with cap is designed and applied in the deep soft soil ground treatment of expressway.The applicability of PTC piles is discussed.The construction technology and technological requrrements are introduced,the spot observation of pore water pressure conducted during the PTC pile construction,the observation data analyzed.In order to avoid the compaction effect of excessive pore water pressure in the process of the PTC pile construction on the surroundings,some measures are put forward to eliminate the effect of pore water pressure.The advantageous conditions are analized and utilized during the dissipation of excessive pore water pressure,so the aim of secondary consolidation treatment will be materialized.

Key concepts: Pore water pressure, Pile, Consolidation (business), Geotechnical engineering, Compaction, Settlement (finance), Dissipation, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Regularity Analysis and Study on Excessive Pore Water Pressure during Jacked Pile of Pre-Ptressed Pipe Piles — Research Paper | ScholarLens