Improving operation speed of differential protection for transformer at serious interior fault
Yang Hui-hong
Abstract
Yang Hui-hong
Abstract
By analyzing the cause of operation time of differential protection and the problem of over-current protection in application,a solution is proposed by adding the fast operation zone to improve the operation speed of transformer differential protection according to the relationship between differential current and restraint current.The numerical simulation results verify that this solution can effectively shorten the operation time of differential protection while the serious internal faults occurring.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
By analyzing the cause of operation time of differential protection and the problem of over-current protection in application,a solution is proposed by adding the fast operation zone to improve the operation speed of transformer differential protection according to the relationship between differential current and restraint current.The numerical simulation results verify that this solution can effectively shorten the operation time of differential protection while the serious internal faults occurring.
Key concepts: Differential protection, Transformer, Current transformer, Differential (mechanical device), Current (fluid), Control theory (sociology), Computer science, Engineering