Practice of Injection-production Adjustments of Low Permeability Reservoirs in Pingbei Area of Ansai Oilfield
LI Min-yong
Abstract
LI Min-yong
Abstract
The main methods to ensure continuous stable production in Ansai Oilfield from 2001 to 2005:1.to enhance wate drive controlling by improving injection-production patterns uninterruptedly;2.to increase the availability of injected water by developing separate water injection;3.to increase the development effect of water injection by several methods;4.to increase the efficiency of water drive by adjusting injection-production series of strata reasonably.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main methods to ensure continuous stable production in Ansai Oilfield from 2001 to 2005:1.to enhance wate drive controlling by improving injection-production patterns uninterruptedly;2.to increase the availability of injected water by developing separate water injection;3.to increase the development effect of water injection by several methods;4.to increase the efficiency of water drive by adjusting injection-production series of strata reasonably.
Key concepts: Water injection (oil production), Petroleum engineering, Environmental science, Production (economics), Water cut, Permeability (electromagnetism), Injection well, Environmental engineering