2006•Journal of Jianghan Petroleum University of Staff and WorkersRequires access

Practice of Injection-production Adjustments of Low Permeability Reservoirs in Pingbei Area of Ansai Oilfield

LI Min-yong

Open publisher page 0 citations

Abstract

The main methods to ensure continuous stable production in Ansai Oilfield from 2001 to 2005:1.to enhance wate drive controlling by improving injection-production patterns uninterruptedly;2.to increase the availability of injected water by developing separate water injection;3.to increase the development effect of water injection by several methods;4.to increase the efficiency of water drive by adjusting injection-production series of strata reasonably.

About this research paper

What this paper is about

The main methods to ensure continuous stable production in Ansai Oilfield from 2001 to 2005:1.to enhance wate drive controlling by improving injection-production patterns uninterruptedly;2.to increase the availability of injected water by developing separate water injection;3.to increase the development effect of water injection by several methods;4.to increase the efficiency of water drive by adjusting injection-production series of strata reasonably.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main methods to ensure continuous stable production in Ansai Oilfield from 2001 to 2005:1.to enhance wate drive controlling by improving injection-production patterns uninterruptedly;2.to increase the availability of injected water by developing separate water injection;3.to increase the development effect of water injection by several methods;4.to increase the efficiency of water drive by adjusting injection-production series of strata reasonably.

Key concepts: Water injection (oil production), Petroleum engineering, Environmental science, Production (economics), Water cut, Permeability (electromagnetism), Injection well, Environmental engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Practice of Injection-production Adjustments of Low Permeability Reservoirs in Pingbei Area of Ansai Oilfield — Research Paper | ScholarLens