2010•Yangtze RiverRequires access

Scouring and silting characteristics of downstream river channel of hydropower projects at abroad

Wang Yan-gui

Open publisher page 1 citations

Abstract

Construction of hydropower project will cause variation of flow and sediment in downstream river channel,especially,the sediment retaining of hydropower project will break the balance of original relative balance of downstream rive channel.In order to adapt to new flow-sediment condition,the scouring and silting of rive channel will be adjusted,resulting in variation of downstream river regime and types,influencing the flood control and navigation of downstream river channel.We analyze the characteristics flow-sediment variation and scouring and silting of downstream river channel and the change of river regime and types after construction of typical hydropower projects at abroad.The analysis results show that the downstream river channel is generally scoured,and the variation of scouring and stilting downstream river channel and the change of river regime and type related with composition of river bank and bed,river plane form and reservoir operation mode etc.

About this research paper

What this paper is about

Construction of hydropower project will cause variation of flow and sediment in downstream river channel,especially,the sediment retaining of hydropower project will break the balance of original relative balance of downstream rive channel.In order to adapt to new flow-sediment condition,the scouring and silting of rive channel will be adjusted,resulting in variation of downstream river regime and types,influencing the flood control and navigation of downstream river channel.We analyze the characteristics flow-sediment variation and scouring and silting of downstream river channel and the change of river regime and types after construction of typical hydropower projects at abroad.The analysis results show that the downstream river channel is generally scoured,and the variation of scouring and stilting downstream river channel and the change of river regime and type related with composition of river bank and bed,river plane form and reservoir operation mode etc.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction of hydropower project will cause variation of flow and sediment in downstream river channel,especially,the sediment retaining of hydropower project will break the balance of original relative balance of downstream rive channel.In order to adapt to new flow-sediment condition,the scouring and silting of rive channel will be adjusted,resulting in variation of downstream river regime and types,influencing the flood control and navigation of downstream river channel.We analyze the characteristics flow-sediment variation and scouring and silting of downstream river channel and the change of river regime and types after construction of typical hydropower projects at abroad.The analysis results show that the downstream river channel is generally scoured,and the variation of scouring and stilting downstream river channel and the change of river regime and type related with composition of river bank and bed,river plane form and reservoir operation mode etc.

Key concepts: Siltation, Downstream (manufacturing), Hydropower, Channel (broadcasting), Hydrology (agriculture), River regime, Sediment, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Scouring and silting characteristics of downstream river channel of hydropower projects at abroad — Research Paper | ScholarLens