Displacement Monitoring and Analysis of Tunnel Construction
Zhu Ji-hua
Abstract
Zhu Ji-hua
Abstract
In order to grasp the changing regulations of circumference convergence and internal displacement of tunnel,the displacement monitoring of initial support and secondary lining is done using SW-VI convergence gauge and three-point displacement meter.The results show that the average velocity of testing sections is less than basic stabilization criterion,and reveals the working status of tunnel support structure is better.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In order to grasp the changing regulations of circumference convergence and internal displacement of tunnel,the displacement monitoring of initial support and secondary lining is done using SW-VI convergence gauge and three-point displacement meter.The results show that the average velocity of testing sections is less than basic stabilization criterion,and reveals the working status of tunnel support structure is better.
Key concepts: Displacement (psychology), Convergence (economics), Engineering, Structural engineering, GRASP, Metre, Point (geometry), Mathematics