2014•Journal of Water Resources and Water EngineeringRequires access

Aanalysis of deformation monitoring and numerical simulation for deep foundation pit project in Shenyang north Station

Yang Bowe

Open publisher page 0 citations

Abstract

Taking the deep foundation pit engineering of integrated transport hub Ⅰ area in Shenyang north station as research object,the paper carried out field monitoring to structure and deformation of foundation pit retaining and analyzed the change rule of deformation of retaining structure in foundation pit construction process with excavation depth and time. By using finite difference software FLAC3D,the whole process of deep excavation support was simulated by 3d. It analyzed the deformation characteristics of the retaining structure after excavation of foundation pit,and carried out comparative analysis for field monitoring results. The results of numerical calculation are consistent with the measured results. The deformation rule of deep foundation pit can be studied by numerical simulation.

About this research paper

What this paper is about

Taking the deep foundation pit engineering of integrated transport hub Ⅰ area in Shenyang north station as research object,the paper carried out field monitoring to structure and deformation of foundation pit retaining and analyzed the change rule of deformation of retaining structure in foundation pit construction process with excavation depth and time. By using finite difference software FLAC3D,the whole process of deep excavation support was simulated by 3d. It analyzed the deformation characteristics of the retaining structure after excavation of foundation pit,and carried out comparative analysis for field monitoring results. The results of numerical calculation are consistent with the measured results. The deformation rule of deep foundation pit can be studied by numerical simulation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking the deep foundation pit engineering of integrated transport hub Ⅰ area in Shenyang north station as research object,the paper carried out field monitoring to structure and deformation of foundation pit retaining and analyzed the change rule of deformation of retaining structure in foundation pit construction process with excavation depth and time. By using finite difference software FLAC3D,the whole process of deep excavation support was simulated by 3d. It analyzed the deformation characteristics of the retaining structure after excavation of foundation pit,and carried out comparative analysis for field monitoring results. The results of numerical calculation are consistent with the measured results. The deformation rule of deep foundation pit can be studied by numerical simulation.

Key concepts: Foundation (evidence), Excavation, Deformation (meteorology), Geotechnical engineering, Computer simulation, Research Object, Deformation monitoring, Engineering