2009•Computer and ModernizationRequires access

Design and Implementation of Network Watt-hour Meter Concentrator

Lei Liu

Open publisher page 0 citations

Abstract

Due to many drawbacks in IC card prepayments watt-hour meter system,the paper puts forward network watt-hour meter system,integrates different communication network,implements unified management of low-voltage automatic meter reading and charging system,introduces the function,design principle and implementation of concentrator.The concentrator is tested by China Electric Power Research Institute.This system takes on electricity purchasing of 200,000 residents in Beijing area and data collection of Electric Corporation.

About this research paper

What this paper is about

Due to many drawbacks in IC card prepayments watt-hour meter system,the paper puts forward network watt-hour meter system,integrates different communication network,implements unified management of low-voltage automatic meter reading and charging system,introduces the function,design principle and implementation of concentrator.The concentrator is tested by China Electric Power Research Institute.This system takes on electricity purchasing of 200,000 residents in Beijing area and data collection of Electric Corporation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Due to many drawbacks in IC card prepayments watt-hour meter system,the paper puts forward network watt-hour meter system,integrates different communication network,implements unified management of low-voltage automatic meter reading and charging system,introduces the function,design principle and implementation of concentrator.The concentrator is tested by China Electric Power Research Institute.This system takes on electricity purchasing of 200,000 residents in Beijing area and data collection of Electric Corporation.

Key concepts: Watt, Concentrator, Metre, Computer science, Electricity meter, Electricity, Automatic meter reading, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Implementation of Network Watt-hour Meter Concentrator — Research Paper | ScholarLens