Design and Construction of Monolayer Steel Sheet Pile Cofferdam

Han Ju

Open publisher page 0 citations

Abstract

The main pier pile cap of Jiuweigang Bridge is constructed according to monolayer steel pile cofferdam scheme.Combined with the site conditions,design and construction of the steel sheet pile cofferdam are analyzed in detail.

About this research paper

What this paper is about

The main pier pile cap of Jiuweigang Bridge is constructed according to monolayer steel pile cofferdam scheme.Combined with the site conditions,design and construction of the steel sheet pile cofferdam are analyzed in detail.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main pier pile cap of Jiuweigang Bridge is constructed according to monolayer steel pile cofferdam scheme.Combined with the site conditions,design and construction of the steel sheet pile cofferdam are analyzed in detail.

Key concepts: Cofferdam, Pier, Sheet pile, Pile, Pile cap, Engineering, Geotechnical engineering, Structural engineering