2001Mining Research and DevelopmentRequires access

Demolition of the Major Workshop in Tianhu Ore Dressing Plant Using Controlled Blasting

Wu Cong

Open publisher page 0 citations

Abstract

This paper presents a case study of blasting demolition of a multi-layered structural workshop. The paper describes the demolition blasting design and the technical measures taken during the operation under complicated blasting circumstances.

About this research paper

What this paper is about

This paper presents a case study of blasting demolition of a multi-layered structural workshop. The paper describes the demolition blasting design and the technical measures taken during the operation under complicated blasting circumstances.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents a case study of blasting demolition of a multi-layered structural workshop. The paper describes the demolition blasting design and the technical measures taken during the operation under complicated blasting circumstances.

Key concepts: Demolition, Rock blasting, Engineering, Construction engineering, Forensic engineering, Civil engineering, Mining engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Demolition of the Major Workshop in Tianhu Ore Dressing Plant Using Controlled Blasting — Research Paper | ScholarLens