Construction technology of cement mixing pile in soft soil foundation treatment of railway
Hou Jian-ji
Abstract
Hou Jian-ji
Abstract
Combined with soft soil foundation treatment work in SG-5 bid section in Guang-Zhu railway line the construction technology of cement mixing pile adopted in soft soil foundation treatment is introduced,at the same time corresponding safety control and quality inspection method in construction process are elaborated in order to accumulate construction experiences and provide technical references for similar works.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with soft soil foundation treatment work in SG-5 bid section in Guang-Zhu railway line the construction technology of cement mixing pile adopted in soft soil foundation treatment is introduced,at the same time corresponding safety control and quality inspection method in construction process are elaborated in order to accumulate construction experiences and provide technical references for similar works.
Key concepts: Pile, Foundation (evidence), Soil cement, Cement, Engineering, Mixing (physics), Civil engineering, Soil treatment