Discussion on the Roadbed Settlement Control Technique of Expressway in Collapsible Loess Area
LU Yue-ju
Abstract
LU Yue-ju
Abstract
This paper analyzes the causes of the roadbed settlement of the expressway in collapsible loess area,introduces three kinds of methods for the treatment of collapsible loess foundation,and probes into how to control the roadbed settlement from five aspects of the treatment of collapsible loess foundation,drainage,side slope protection,roadbed settlement monitoring,and roadbed maintenance,which provide some theoretical bases for future expressway construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper analyzes the causes of the roadbed settlement of the expressway in collapsible loess area,introduces three kinds of methods for the treatment of collapsible loess foundation,and probes into how to control the roadbed settlement from five aspects of the treatment of collapsible loess foundation,drainage,side slope protection,roadbed settlement monitoring,and roadbed maintenance,which provide some theoretical bases for future expressway construction.
Key concepts: Loess, Settlement (finance), Foundation (evidence), Geotechnical engineering, Drainage, Geology, Civil engineering, Engineering