2006•Electric Power Science and EngineeringRequires access

Design of Finned-tube Economizer of E-670-13.8 Boiler and Its Performance in Zhangze Power Plant

Zhimin Liu

Open publisher page 0 citations

Abstract

The boilers of Unit 3 in Zhangze Power Plant are E-670-13.8-545KT (TE-215/AC series) steam boilers manufactured by tower do Rogge Boiler-making Plant of former Soviet Union. Because of the high coal ash content, the erosion of economizers is quite serious. To use economizer s retrofitting plan with finned-tube economizer can reduce erosion and improve the economizer life. The retrofitting project was implemented in 2004 and obtained good effect.

About this research paper

What this paper is about

The boilers of Unit 3 in Zhangze Power Plant are E-670-13.8-545KT (TE-215/AC series) steam boilers manufactured by tower do Rogge Boiler-making Plant of former Soviet Union. Because of the high coal ash content, the erosion of economizers is quite serious. To use economizer s retrofitting plan with finned-tube economizer can reduce erosion and improve the economizer life. The retrofitting project was implemented in 2004 and obtained good effect.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The boilers of Unit 3 in Zhangze Power Plant are E-670-13.8-545KT (TE-215/AC series) steam boilers manufactured by tower do Rogge Boiler-making Plant of former Soviet Union. Because of the high coal ash content, the erosion of economizers is quite serious. To use economizer s retrofitting plan with finned-tube economizer can reduce erosion and improve the economizer life. The retrofitting project was implemented in 2004 and obtained good effect.

Key concepts: Economizer, Retrofitting, Boiler (water heating), Power station, Waste management, Engineering, Pulverized coal-fired boiler, Coal

Related papers

Back to paper searchBrowse research topicsOriginal source
Design of Finned-tube Economizer of E-670-13.8 Boiler and Its Performance in Zhangze Power Plant — Research Paper | ScholarLens