Study on operation status of coarse coal slime separation system in Quandian Coal Preparation Plant
Huang Zongjie
Abstract
Huang Zongjie
Abstract
The operation status of equipments in coarse coal slime separation system in Quandian Coal Preparation Plant is analyzed and studied in detail,which contains primary slime classifying hydrocyclones,teetered bed separators(TBS),arch sieves,high frequency sieves,clean coal slime dewatering centrifuges and so on.Main problems existing in the system are pointed out and some reasonable suggestions are provided,so as to increase the yield of the clean coal and raise the economic benefits of the plant.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The operation status of equipments in coarse coal slime separation system in Quandian Coal Preparation Plant is analyzed and studied in detail,which contains primary slime classifying hydrocyclones,teetered bed separators(TBS),arch sieves,high frequency sieves,clean coal slime dewatering centrifuges and so on.Main problems existing in the system are pointed out and some reasonable suggestions are provided,so as to increase the yield of the clean coal and raise the economic benefits of the plant.
Key concepts: Coal preparation plant, Coal, Waste management, Engineering, Clean coal, Dewatering, Process engineering, Geotechnical engineering