The Cast-in-place Cantilever Method With Cradles at the Giant Continuous Box Girder Bridge Across the Beijing-Hangzhou Grand Canal
Hong Shun Hao
Abstract
Hong Shun Hao
Abstract
There is an increasing tendency to extend the span of the continuous box girder in bridgework.The cast-in-place cantilever method with rhombic trussed cradle is adopted at the giant prestressed concrete continuous box girder bridge across the Beijing-Hangzhou Grand Canal,in the Beijing-Fuzhou Expressway.Demonstrated here are the structure of the cradle and the functions of the various parts,the top pressure test,and the pouring technique of the steel concrete box girder.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
There is an increasing tendency to extend the span of the continuous box girder in bridgework.The cast-in-place cantilever method with rhombic trussed cradle is adopted at the giant prestressed concrete continuous box girder bridge across the Beijing-Hangzhou Grand Canal,in the Beijing-Fuzhou Expressway.Demonstrated here are the structure of the cradle and the functions of the various parts,the top pressure test,and the pouring technique of the steel concrete box girder.
Key concepts: Box girder, Beijing, Cantilever, Structural engineering, Bridge (graph theory), Span (engineering), Engineering, Girder