Research and Application of Operational Electronic Board System of Guangdong Power Grid
Li B
Abstract
Li B
Abstract
In allusion to problems of difficulties in arranging power grid operation and transferring schedule control information,electronic board system for power grid operation was developed which was mainly used for issuing various plans and temporary operation arrangements of the dispatching center to subordinate various regional dispatching centers and substations as well as dynamically update various operational process in real time by tracing implementation of dispatching orders. Combining engineering practice,system structures,function design and key technologies of the electronic board system were analyzed and the system for power grid operation was applied in Guangdong power grid. Application effects indicate that this system can not only ensure reasonable arrangement for field operational work and reduce unnecessary waiting time,but also improve dispatching and management levels and capacities and increase operation efficiency for the power grid.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In allusion to problems of difficulties in arranging power grid operation and transferring schedule control information,electronic board system for power grid operation was developed which was mainly used for issuing various plans and temporary operation arrangements of the dispatching center to subordinate various regional dispatching centers and substations as well as dynamically update various operational process in real time by tracing implementation of dispatching orders. Combining engineering practice,system structures,function design and key technologies of the electronic board system were analyzed and the system for power grid operation was applied in Guangdong power grid. Application effects indicate that this system can not only ensure reasonable arrangement for field operational work and reduce unnecessary waiting time,but also improve dispatching and management levels and capacities and increase operation efficiency for the power grid.
Key concepts: Schedule, Grid, Tracing, Power grid, Engineering, Process (computing), Power (physics), Electric power system