Technical improvement and operation analysis of ZGM133G pulverizers for 1000 MW power units

MA Xin-li

Open publisher page 0 citations

Abstract

Xuzhou Pengcheng Power Plant Ⅲ project is equipped with 6 pulverizers(ZGM133G medium-speed disc-type).The paper introduces main technical characteristics of the ZGM133G medium-speed pulverizers,and analyses operation characteristics concerning body structure,automatic setting variable loading system technology,vibration,roller load force,wind-coal ratio and dynamic separator speed.The corresponding solutions for problems in commissioning are put forward.

About this research paper

What this paper is about

Xuzhou Pengcheng Power Plant Ⅲ project is equipped with 6 pulverizers(ZGM133G medium-speed disc-type).The paper introduces main technical characteristics of the ZGM133G medium-speed pulverizers,and analyses operation characteristics concerning body structure,automatic setting variable loading system technology,vibration,roller load force,wind-coal ratio and dynamic separator speed.The corresponding solutions for problems in commissioning are put forward.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Xuzhou Pengcheng Power Plant Ⅲ project is equipped with 6 pulverizers(ZGM133G medium-speed disc-type).The paper introduces main technical characteristics of the ZGM133G medium-speed pulverizers,and analyses operation characteristics concerning body structure,automatic setting variable loading system technology,vibration,roller load force,wind-coal ratio and dynamic separator speed.The corresponding solutions for problems in commissioning are put forward.

Key concepts: Engineering, Separator (oil production), Power station, Vibration, Coal, Mechanical engineering, Automotive engineering, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Technical improvement and operation analysis of ZGM133G pulverizers for 1000 MW power units — Research Paper | ScholarLens