Construction Control over the Continuous Rigid Frame of the 2nd Luzhou Yangtze River Bridge with a Large and Unsymmetrical Span
Wenli Fan
Abstract
Wenli Fan
Abstract
The main span of the 2nd Luzhou Yangtze River Bridge is a girder structure of a nonsymmetrical continuous prestressed concrete rigid frame.The cantilever construction method is used for its building.On account of its complicatedness,the structure systems and forces are varied during the construction procedures.Therefore,it is necessary to control the construction procedure.This paper introduces the main method and the theory of construction control.With an effective control,the results of alignment and stress of the bridge are presented,which scientifically ensure the quality and safety of the whole construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main span of the 2nd Luzhou Yangtze River Bridge is a girder structure of a nonsymmetrical continuous prestressed concrete rigid frame.The cantilever construction method is used for its building.On account of its complicatedness,the structure systems and forces are varied during the construction procedures.Therefore,it is necessary to control the construction procedure.This paper introduces the main method and the theory of construction control.With an effective control,the results of alignment and stress of the bridge are presented,which scientifically ensure the quality and safety of the whole construction.
Key concepts: Rigid frame, Bridge (graph theory), Yangtze river, Span (engineering), Cantilever, Structural engineering, Frame (networking), Prestressed concrete