Construction scheme of cast-in-situ box girder of Qincheng hub overpass bridge
Liqin Han
Abstract
Liqin Han
Abstract
This article discusses and analyzes construction scheme of cast-in-situ box girder of Xinzhou-Fuping high-speed Qincheng hub overpass bridge,puts forward feasible construction program,and makes specific description.As a result,it solves cast-in-situ box girder construction problem of overpass highway,guarantees normal highway transportation,and achieves safe transporation and civilized construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This article discusses and analyzes construction scheme of cast-in-situ box girder of Xinzhou-Fuping high-speed Qincheng hub overpass bridge,puts forward feasible construction program,and makes specific description.As a result,it solves cast-in-situ box girder construction problem of overpass highway,guarantees normal highway transportation,and achieves safe transporation and civilized construction.
Key concepts: Bridge (graph theory), Box girder, Scheme (mathematics), Engineering, Structural engineering, Girder, Civil engineering, Mathematics