In order to summarize the technology and experience of open caisson construction,we presented the design and construction procedure of an open-caisson pump station in detail.The open-caisson is inside the Yangtze River levee and the geomorphology is the first terrace of Yangtze River.On the basis of detailed analysis on geological condition of the works,the loading conditions of the open caisson in different stages were analyzed,and the sinking construction scheme of the open caisson was designed.The key technological issues and treatment measures under special conditions in open caisson sinking and bottom sealing process were introduced.Due to reasonable construction design scheme and proper treatment measures,no settlement or deviation of open caisson occurred up to now.

About this research paper

What this paper is about

In order to summarize the technology and experience of open caisson construction,we presented the design and construction procedure of an open-caisson pump station in detail.The open-caisson is inside the Yangtze River levee and the geomorphology is the first terrace of Yangtze River.On the basis of detailed analysis on geological condition of the works,the loading conditions of the open caisson in different stages were analyzed,and the sinking construction scheme of the open caisson was designed.The key technological issues and treatment measures under special conditions in open caisson sinking and bottom sealing process were introduced.Due to reasonable construction design scheme and proper treatment measures,no settlement or deviation of open caisson occurred up to now.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to summarize the technology and experience of open caisson construction,we presented the design and construction procedure of an open-caisson pump station in detail.The open-caisson is inside the Yangtze River levee and the geomorphology is the first terrace of Yangtze River.On the basis of detailed analysis on geological condition of the works,the loading conditions of the open caisson in different stages were analyzed,and the sinking construction scheme of the open caisson was designed.The key technological issues and treatment measures under special conditions in open caisson sinking and bottom sealing process were introduced.Due to reasonable construction design scheme and proper treatment measures,no settlement or deviation of open caisson occurred up to now.

Key concepts: Caisson, Levee, Yangtze river, Settlement (finance), Terrace (agriculture), Geotechnical engineering, Engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Some key techniques in construction of deep open caisson inside Yangtze River levee — Research Paper | ScholarLens