Calibration Instantaneous Unit Hydrograph Used for Flood Forecast of Existing Bridges

Zheng Li

Open publisher page 0 citations

Abstract

Based on instantaneous unit hydrograph,calibration instantaneous unit hydrograph method is put forward to forecast flood of existing bridges: instantaneous unit hydrograph is calibrated depending on water marks on piers left by historical flood and the corresponding rainfall series;by means of calibration instantaneous unit hydrograph,flood-peak stage and peak time lag is forecasted.In the whole process,water level-flow function is established beforehand to switch from flow to water level directly;biquadrate polynomial fitting is done at high flow segment of flow duration curve getting from instantaneous unit hydrograph.The study shows that this new method is rational in theory,convenient in practical application,reliable in computational accuracy,and can forecast flood disaster ahead of time to gain precious preparation time for guarantee traffic safety and flood fighting.So it will have good prospects in the aspect of forecast flood disaster of existing bridges.

About this research paper

What this paper is about

Based on instantaneous unit hydrograph,calibration instantaneous unit hydrograph method is put forward to forecast flood of existing bridges: instantaneous unit hydrograph is calibrated depending on water marks on piers left by historical flood and the corresponding rainfall series;by means of calibration instantaneous unit hydrograph,flood-peak stage and peak time lag is forecasted.In the whole process,water level-flow function is established beforehand to switch from flow to water level directly;biquadrate polynomial fitting is done at high flow segment of flow duration curve getting from instantaneous unit hydrograph.The study shows that this new method is rational in theory,convenient in practical application,reliable in computational accuracy,and can forecast flood disaster ahead of time to gain precious preparation time for guarantee traffic safety and flood fighting.So it will have good prospects in the aspect of forecast flood disaster of existing bridges.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on instantaneous unit hydrograph,calibration instantaneous unit hydrograph method is put forward to forecast flood of existing bridges: instantaneous unit hydrograph is calibrated depending on water marks on piers left by historical flood and the corresponding rainfall series;by means of calibration instantaneous unit hydrograph,flood-peak stage and peak time lag is forecasted.In the whole process,water level-flow function is established beforehand to switch from flow to water level directly;biquadrate polynomial fitting is done at high flow segment of flow duration curve getting from instantaneous unit hydrograph.The study shows that this new method is rational in theory,convenient in practical application,reliable in computational accuracy,and can forecast flood disaster ahead of time to gain precious preparation time for guarantee traffic safety and flood fighting.So it will have good prospects in the aspect of forecast flood disaster of existing bridges.

Key concepts: Hydrograph, Flood myth, Calibration, Flow (mathematics), Flood forecasting, Hydrology (agriculture), Environmental science, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Calibration Instantaneous Unit Hydrograph Used for Flood Forecast of Existing Bridges — Research Paper | ScholarLens