Investment control measures by cost engineers

Chen De-nin

Open publisher page 0 citations

Abstract

From decision phase,design stage,bidding stage,construction and completion stage the investment controls are analyzed.Author points out that investment control should take the engineering characteristics of every stage in consideration to ensure investment return.

About this research paper

What this paper is about

From decision phase,design stage,bidding stage,construction and completion stage the investment controls are analyzed.Author points out that investment control should take the engineering characteristics of every stage in consideration to ensure investment return.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

From decision phase,design stage,bidding stage,construction and completion stage the investment controls are analyzed.Author points out that investment control should take the engineering characteristics of every stage in consideration to ensure investment return.

Key concepts: Bidding, Investment (military), Return on investment, Stage (stratigraphy), Control (management), Operations management, Business, Actuarial science

Related papers

Back to paper searchBrowse research topicsOriginal source
Investment control measures by cost engineers — Research Paper | ScholarLens