Transition and connection design of berths ~#5~~#7 with the existing structures at Mawan Port Area,Shenzhen Port
Min Huang
Abstract
Min Huang
Abstract
By analyzing and summarizing the technical principles,influential factors,main countermeasures,engineering advantages and disadvantages in transition and connection design of berths #5~#7 with the existing structures at Mawan Port Area,Shenzhen Port,critical issues including structure,geology,and supplementary borehole data,etc,are put forward to provide a reference for similar design.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
By analyzing and summarizing the technical principles,influential factors,main countermeasures,engineering advantages and disadvantages in transition and connection design of berths #5~#7 with the existing structures at Mawan Port Area,Shenzhen Port,critical issues including structure,geology,and supplementary borehole data,etc,are put forward to provide a reference for similar design.
Key concepts: Port (circuit theory), Connection (principal bundle), Civil engineering, Engineering, Borehole, Construction engineering, Transport engineering, Mechanical engineering