2005Sci-Tech Information Development & EconomyRequires access

On the Quality Control of the Cement Stable Macadam Base

Xiaoya Liu

Open publisher page 0 citations

Abstract

Connecting with the flow method adopted in the construction of the cement stable macadam base of the No.6 contract section of the Qi-lin Superhighway, this paper briefly introduces its material selection, construction techniques and quality control methods.

About this research paper

What this paper is about

Connecting with the flow method adopted in the construction of the cement stable macadam base of the No.6 contract section of the Qi-lin Superhighway, this paper briefly introduces its material selection, construction techniques and quality control methods.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Connecting with the flow method adopted in the construction of the cement stable macadam base of the No.6 contract section of the Qi-lin Superhighway, this paper briefly introduces its material selection, construction techniques and quality control methods.

Key concepts: Cement, Base (topology), Quality (philosophy), Control (management), Selection (genetic algorithm), Engineering, Civil engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
On the Quality Control of the Cement Stable Macadam Base — Research Paper | ScholarLens