2001•Yangtze RiverRequires access

General layout of Jiangkou hydropower station project

Wang You-yang

Open publisher page 0 citations

Abstract

Jiangkou hydropower station has a total reservoir storage of 497 Mm\+3 and an installed capacity of 300 MW. The maximum height of the concrete double curvature arch dam is 139 m.The hydro compex is of grade -Ⅱ project.In consideration of the topographic and geologic conditions at the dam site,and of the features of all main structures,the general layout scheme of the hydro complex is selected after a comprehensive comparison.In this layout,the water-retaining and water-releasing structure i.e.the concrete arch dam,is arranged on the river bed,and the underground power house on the left bank and the water diversion tunnel on the right bank.The artificial aggregate system and the high concrete mixing system are arranged at the gentle Dingjia col on the right bank,downstream form the dam.

About this research paper

What this paper is about

Jiangkou hydropower station has a total reservoir storage of 497 Mm\+3 and an installed capacity of 300 MW. The maximum height of the concrete double curvature arch dam is 139 m.The hydro compex is of grade -Ⅱ project.In consideration of the topographic and geologic conditions at the dam site,and of the features of all main structures,the general layout scheme of the hydro complex is selected after a comprehensive comparison.In this layout,the water-retaining and water-releasing structure i.e.the concrete arch dam,is arranged on the river bed,and the underground power house on the left bank and the water diversion tunnel on the right bank.The artificial aggregate system and the high concrete mixing system are arranged at the gentle Dingjia col on the right bank,downstream form the dam.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Jiangkou hydropower station has a total reservoir storage of 497 Mm\+3 and an installed capacity of 300 MW. The maximum height of the concrete double curvature arch dam is 139 m.The hydro compex is of grade -Ⅱ project.In consideration of the topographic and geologic conditions at the dam site,and of the features of all main structures,the general layout scheme of the hydro complex is selected after a comprehensive comparison.In this layout,the water-retaining and water-releasing structure i.e.the concrete arch dam,is arranged on the river bed,and the underground power house on the left bank and the water diversion tunnel on the right bank.The artificial aggregate system and the high concrete mixing system are arranged at the gentle Dingjia col on the right bank,downstream form the dam.

Key concepts: Arch dam, Hydropower, Geotechnical engineering, Arch, River bed, Hydrology (agriculture), Hydroelectricity, Water level