2009Sci-Tech Information Development & EconomyRequires access

Talking about the Deep Foundation Pit Dewatering Scheme of a Certain Subway Station

Liu Xin-ron

Open publisher page 0 citations

Abstract

This paper introduces the construction situation of a certain subway station adopting open-cut construction and selecting drilled piles as fencing structure,analyzes the types and buried depth of groundwater,calculates the construction dewatering,and determines the dewatering scheme.

About this research paper

What this paper is about

This paper introduces the construction situation of a certain subway station adopting open-cut construction and selecting drilled piles as fencing structure,analyzes the types and buried depth of groundwater,calculates the construction dewatering,and determines the dewatering scheme.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper introduces the construction situation of a certain subway station adopting open-cut construction and selecting drilled piles as fencing structure,analyzes the types and buried depth of groundwater,calculates the construction dewatering,and determines the dewatering scheme.

Key concepts: Dewatering, Foundation (evidence), Engineering, Scheme (mathematics), Civil engineering, Subway station, Geotechnical engineering, Fencing

Related papers

Back to paper searchBrowse research topicsOriginal source
Talking about the Deep Foundation Pit Dewatering Scheme of a Certain Subway Station — Research Paper | ScholarLens