Talking about the Deep Foundation Pit Dewatering Scheme of a Certain Subway Station
Liu Xin-ron
Abstract
Liu Xin-ron
Abstract
This paper introduces the construction situation of a certain subway station adopting open-cut construction and selecting drilled piles as fencing structure,analyzes the types and buried depth of groundwater,calculates the construction dewatering,and determines the dewatering scheme.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper introduces the construction situation of a certain subway station adopting open-cut construction and selecting drilled piles as fencing structure,analyzes the types and buried depth of groundwater,calculates the construction dewatering,and determines the dewatering scheme.
Key concepts: Dewatering, Foundation (evidence), Engineering, Scheme (mathematics), Civil engineering, Subway station, Geotechnical engineering, Fencing