2009•Northwest HydropowerRequires access

Ventilation Solution for west-end diversion tunnel construction in Jingping II hydropower station

Qihu Li

Open publisher page 0 citations

Abstract

Good environment in tunneling operation is important for ensuring tunnel works quality,increasing construction efficiency,and protecting the health of construction workers.In regards to the water diversion tunnel works of Jiping II hydropower station,the hydrogeological conditions are complicated and characterized by thick buried depth,large diameter and long tunnel alignment.In view of the particular construction environment,the west-end water diversion tunnel has to be constructed by the drill and blast method,and flexible transport.To improve tunneling environment,the construction company implemented the blowing and lane-type ventilation solution so that a good operation environment was provided for normal construction of the west-end water diversion tunnel.

About this research paper

What this paper is about

Good environment in tunneling operation is important for ensuring tunnel works quality,increasing construction efficiency,and protecting the health of construction workers.In regards to the water diversion tunnel works of Jiping II hydropower station,the hydrogeological conditions are complicated and characterized by thick buried depth,large diameter and long tunnel alignment.In view of the particular construction environment,the west-end water diversion tunnel has to be constructed by the drill and blast method,and flexible transport.To improve tunneling environment,the construction company implemented the blowing and lane-type ventilation solution so that a good operation environment was provided for normal construction of the west-end water diversion tunnel.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Good environment in tunneling operation is important for ensuring tunnel works quality,increasing construction efficiency,and protecting the health of construction workers.In regards to the water diversion tunnel works of Jiping II hydropower station,the hydrogeological conditions are complicated and characterized by thick buried depth,large diameter and long tunnel alignment.In view of the particular construction environment,the west-end water diversion tunnel has to be constructed by the drill and blast method,and flexible transport.To improve tunneling environment,the construction company implemented the blowing and lane-type ventilation solution so that a good operation environment was provided for normal construction of the west-end water diversion tunnel.

Key concepts: Hydropower, Water diversion, Tunnel construction, Engineering, Ventilation (architecture), Civil engineering, Environmental science, Geotechnical engineering