Application of CD method in the inclined shaft ripping construction of Guanyintang tunnel
LI Ming-gen
Abstract
LI Ming-gen
Abstract
Combined with the construction of Guanyintang tunnel,it puts forward the general construction plan of tunnel ripping construction,illustrates the main technological parameters of leading inclined shaft into main tunnel,and elaborates the construction method and its key points in the ripping construction of tunnel,which provides a reference for readers.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with the construction of Guanyintang tunnel,it puts forward the general construction plan of tunnel ripping construction,illustrates the main technological parameters of leading inclined shaft into main tunnel,and elaborates the construction method and its key points in the ripping construction of tunnel,which provides a reference for readers.
Key concepts: Tunnel construction, Engineering, Plan (archaeology), Key (lock), Civil engineering, Structural engineering, Geotechnical engineering, Geology