2011•Yunnan Water PowerRequires access

Flood Discharging and Energy Dissipation Hydraulic Model Test and Study of the Arch Dam for the Shimenkan Hydropower Project

Ping Qi

Open publisher page 0 citations

Abstract

In order to gain a clear idea of the capability of flood discharging and energy dissipation of the arch dam of the Shimenkan hydropower project,a hydraulic model test of arch dam flood discharging capability was made to simulate flood discharging capability,outlet flow velocity,pressure distribution,energy dissipation and erosion under individual operation of 3 crest outlets and 2 intermediate outlets or under joint operation of a crest outlet and an intermediate outlet,so that the shapes and configurations of the crest outlets and the intermediate outlets in the original design could be verified and finalized.The change of pressure applied on the plunge pool bottom plate during flood discharging was simulated and necessary measures were taken to protect the bottom plat from damage according to the simulation result.A simple analysis was made of atomization caused by flood discharging,and comments on improvement were put forward.

About this research paper

What this paper is about

In order to gain a clear idea of the capability of flood discharging and energy dissipation of the arch dam of the Shimenkan hydropower project,a hydraulic model test of arch dam flood discharging capability was made to simulate flood discharging capability,outlet flow velocity,pressure distribution,energy dissipation and erosion under individual operation of 3 crest outlets and 2 intermediate outlets or under joint operation of a crest outlet and an intermediate outlet,so that the shapes and configurations of the crest outlets and the intermediate outlets in the original design could be verified and finalized.The change of pressure applied on the plunge pool bottom plate during flood discharging was simulated and necessary measures were taken to protect the bottom plat from damage according to the simulation result.A simple analysis was made of atomization caused by flood discharging,and comments on improvement were put forward.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to gain a clear idea of the capability of flood discharging and energy dissipation of the arch dam of the Shimenkan hydropower project,a hydraulic model test of arch dam flood discharging capability was made to simulate flood discharging capability,outlet flow velocity,pressure distribution,energy dissipation and erosion under individual operation of 3 crest outlets and 2 intermediate outlets or under joint operation of a crest outlet and an intermediate outlet,so that the shapes and configurations of the crest outlets and the intermediate outlets in the original design could be verified and finalized.The change of pressure applied on the plunge pool bottom plate during flood discharging was simulated and necessary measures were taken to protect the bottom plat from damage according to the simulation result.A simple analysis was made of atomization caused by flood discharging,and comments on improvement were put forward.

Key concepts: Hydropower, Flood myth, Crest, Arch dam, Dissipation, Weir, Arch, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Flood Discharging and Energy Dissipation Hydraulic Model Test and Study of the Arch Dam for the Shimenkan Hydropower Project — Research Paper | ScholarLens