2014Qiaoliang jiansheRequires access

Design of Steel Girder of Main Bridge of Huanggang Changjiang River Rail-cum-Road Bridge

Peng Wen

Open publisher page 0 citations

Abstract

The main bridge of Huanggang Changjiang River Rail-cum-Road Bridge is a fivespan continuous steel truss girder cable-stayed bridge with span arrangement(81+243+567+243+81)m.The bridge is designed as the one of the structural system of rigidly fixed pylons and piers and separated pylons and girder and is arranged into the double-deck steel truss girder structure.The upper deck of the bridge carries bidirectional 4-lane expressways and the truss width of the deck is 27.5mwhile the lower deck carries double-track railways and the truss width of the deck is 16m.The cross section of the steel truss girder is the inverted trapezoidal inclined main truss section having the truss height of 15.5mand panel length of 13.5m.The main truss is the N-shape truss,the upper and lower chords of the truss are of the parallelogram sections and the diagonal members are of the parallelogram or the inclined I-shape sections.The panel points are the welded integral panel points and the members at the locations of the points are all spliced with equal strength.The stay cables are anchored in the panel points of the upper chords via the builtin steel anchor boxes.The floor systems of the roadway and railway are the integral orthotropic floor systems of plate and truss composite structures and at the locations of the panel points of plate the upper chords,the lateral bracing systems of triangular trusses are arranged.

About this research paper

What this paper is about

The main bridge of Huanggang Changjiang River Rail-cum-Road Bridge is a fivespan continuous steel truss girder cable-stayed bridge with span arrangement(81+243+567+243+81)m.The bridge is designed as the one of the structural system of rigidly fixed pylons and piers and separated pylons and girder and is arranged into the double-deck steel truss girder structure.The upper deck of the bridge carries bidirectional 4-lane expressways and the truss width of the deck is 27.5mwhile the lower deck carries double-track railways and the truss width of the deck is 16m.The cross section of the steel truss girder is the inverted trapezoidal inclined main truss section having the truss height of 15.5mand panel length of 13.5m.The main truss is the N-shape truss,the upper and lower chords of the truss are of the parallelogram sections and the diagonal members are of the parallelogram or the inclined I-shape sections.The panel points are the welded integral panel points and the members at the locations of the points are all spliced with equal strength.The stay cables are anchored in the panel points of the upper chords via the builtin steel anchor boxes.The floor systems of the roadway and railway are the integral orthotropic floor systems of plate and truss composite structures and at the locations of the panel points of plate the upper chords,the lateral bracing systems of triangular trusses are arranged.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main bridge of Huanggang Changjiang River Rail-cum-Road Bridge is a fivespan continuous steel truss girder cable-stayed bridge with span arrangement(81+243+567+243+81)m.The bridge is designed as the one of the structural system of rigidly fixed pylons and piers and separated pylons and girder and is arranged into the double-deck steel truss girder structure.The upper deck of the bridge carries bidirectional 4-lane expressways and the truss width of the deck is 27.5mwhile the lower deck carries double-track railways and the truss width of the deck is 16m.The cross section of the steel truss girder is the inverted trapezoidal inclined main truss section having the truss height of 15.5mand panel length of 13.5m.The main truss is the N-shape truss,the upper and lower chords of the truss are of the parallelogram sections and the diagonal members are of the parallelogram or the inclined I-shape sections.The panel points are the welded integral panel points and the members at the locations of the points are all spliced with equal strength.The stay cables are anchored in the panel points of the upper chords via the builtin steel anchor boxes.The floor systems of the roadway and railway are the integral orthotropic floor systems of plate and truss composite structures and at the locations of the panel points of plate the upper chords,the lateral bracing systems of triangular trusses are arranged.

Key concepts: Truss, Structural engineering, Deck, Girder, Engineering, Truss bridge, Bridge (graph theory), Span (engineering)

Related papers

Back to paper searchBrowse research topicsOriginal source
Design of Steel Girder of Main Bridge of Huanggang Changjiang River Rail-cum-Road Bridge — Research Paper | ScholarLens