DIRECTIONAL BLASTING DEMOLITION OF A FLOUR MILL WORKSHOP

Feng Wan-hui

Open publisher page 0 citations

Abstract

The building to be demolished was a frame structured complex of workshop and office building.Required by the flowsheet of flour milling equipment in the workshop,this building was subjected to bear both dynamic and static load.And it was divided into three sections based on its dilatation joints,with each individual section and that in different storey having different structure.Considering the building′s features,the blasting was conducted by strictly controlling the operational parameters cooperated with effective vibration reduction and protection measures,and reached anticipated effect in terms of safety and quality.

About this research paper

What this paper is about

The building to be demolished was a frame structured complex of workshop and office building.Required by the flowsheet of flour milling equipment in the workshop,this building was subjected to bear both dynamic and static load.And it was divided into three sections based on its dilatation joints,with each individual section and that in different storey having different structure.Considering the building′s features,the blasting was conducted by strictly controlling the operational parameters cooperated with effective vibration reduction and protection measures,and reached anticipated effect in terms of safety and quality.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The building to be demolished was a frame structured complex of workshop and office building.Required by the flowsheet of flour milling equipment in the workshop,this building was subjected to bear both dynamic and static load.And it was divided into three sections based on its dilatation joints,with each individual section and that in different storey having different structure.Considering the building′s features,the blasting was conducted by strictly controlling the operational parameters cooperated with effective vibration reduction and protection measures,and reached anticipated effect in terms of safety and quality.

Key concepts: Demolition, Rock blasting, Engineering, Mill, Frame (networking), Section (typography), Civil engineering, Reduction (mathematics)

Related papers

Back to paper searchBrowse research topicsOriginal source
DIRECTIONAL BLASTING DEMOLITION OF A FLOUR MILL WORKSHOP — Research Paper | ScholarLens