2012Shanxi ArchitectureRequires access

On treatment measures for relative problems in bored pile construction

XI Xiu-peng

Open publisher page 0 citations

Abstract

The paper has the brief introduction on the features of the bored piles and the application circumstance,analyzes the problems in the drilling,the grouting of underwater concrete,and all steps after the grouted piles in the construction of the bored piles,analyzes the quality shortages,and provides respective treatment methods,so as to have the important significance for improve the construction quality of the bored piles and extending the basic application of the bored piles.

About this research paper

What this paper is about

The paper has the brief introduction on the features of the bored piles and the application circumstance,analyzes the problems in the drilling,the grouting of underwater concrete,and all steps after the grouted piles in the construction of the bored piles,analyzes the quality shortages,and provides respective treatment methods,so as to have the important significance for improve the construction quality of the bored piles and extending the basic application of the bored piles.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper has the brief introduction on the features of the bored piles and the application circumstance,analyzes the problems in the drilling,the grouting of underwater concrete,and all steps after the grouted piles in the construction of the bored piles,analyzes the quality shortages,and provides respective treatment methods,so as to have the important significance for improve the construction quality of the bored piles and extending the basic application of the bored piles.

Key concepts: Pile, Economic shortage, Engineering, Underwater, Forensic engineering, Civil engineering, Drilling, Quality (philosophy)

Related papers

Back to paper searchBrowse research topicsOriginal source
On treatment measures for relative problems in bored pile construction — Research Paper | ScholarLens