On treatment measures for relative problems in bored pile construction
XI Xiu-peng
Abstract
XI Xiu-peng
Abstract
The paper has the brief introduction on the features of the bored piles and the application circumstance,analyzes the problems in the drilling,the grouting of underwater concrete,and all steps after the grouted piles in the construction of the bored piles,analyzes the quality shortages,and provides respective treatment methods,so as to have the important significance for improve the construction quality of the bored piles and extending the basic application of the bored piles.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper has the brief introduction on the features of the bored piles and the application circumstance,analyzes the problems in the drilling,the grouting of underwater concrete,and all steps after the grouted piles in the construction of the bored piles,analyzes the quality shortages,and provides respective treatment methods,so as to have the important significance for improve the construction quality of the bored piles and extending the basic application of the bored piles.
Key concepts: Pile, Economic shortage, Engineering, Underwater, Forensic engineering, Civil engineering, Drilling, Quality (philosophy)