Seepage Behavior and Its Control Scheme of Lianghekou Core-wall Rockfill Dam
Fu Yao
Abstract
Fu Yao
Abstract
The 3-D seepage finite element model of dam site for Lianghekou water project is set up,and the behavior of stable seepage field of dam body and its foundation is calculated and analyzed for water storage period.The equipotential distribution of the seepage field and seepage gradient of dam body and seepage discharge etc are obtained.The effect of the depth and length of impervious curtain of dam foundation and the dam abutment on seepage field is analyzed,and the seepage parameter of impervious curtain and rock mass of dam foundation on seepage field is analyzed too.It is shown that the seepage control scheme of the dam can satisfied with the design code.In addition the proposal that the impervious curtain cut off the bedrock with seepage coefficient large than 3 Lu only is suggested.And for the impervious curtain of left bank the length may be reduced by 50 m.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The 3-D seepage finite element model of dam site for Lianghekou water project is set up,and the behavior of stable seepage field of dam body and its foundation is calculated and analyzed for water storage period.The equipotential distribution of the seepage field and seepage gradient of dam body and seepage discharge etc are obtained.The effect of the depth and length of impervious curtain of dam foundation and the dam abutment on seepage field is analyzed,and the seepage parameter of impervious curtain and rock mass of dam foundation on seepage field is analyzed too.It is shown that the seepage control scheme of the dam can satisfied with the design code.In addition the proposal that the impervious curtain cut off the bedrock with seepage coefficient large than 3 Lu only is suggested.And for the impervious curtain of left bank the length may be reduced by 50 m.
Key concepts: Impervious surface, Geotechnical engineering, Abutment, Geology, Foundation (evidence), Bedrock, Engineering, Geomorphology