2009Journal of Nanchang Hangkong UniversityRequires access

Elasto-Plasticity of Circular Tunnel Consioering Seepaye Field in the Construction Period

Xu Bei

Open publisher page 0 citations

Abstract

The circular tunnel is a common structure in civil engineering.It is assumed that all the influence factors surrounding circle tunnel are axially symmetrical,and interface of elastic and plastic regions is in surrounding rock.Applying Mohr-Coulomb yield criterion and principal of effective stress,the elasto-plastic stress analysis method is established considering the seepage field in construction period and corresponding analytical formula is also presented.Firstly,plastic radius are resolved through trial or iteration method.Secondly,external press of tunnel is obtained,Thirdly,the stress and displacement of circular tunnel and surrounding rock is gained.An example is analyzed based on this method.

About this research paper

What this paper is about

The circular tunnel is a common structure in civil engineering.It is assumed that all the influence factors surrounding circle tunnel are axially symmetrical,and interface of elastic and plastic regions is in surrounding rock.Applying Mohr-Coulomb yield criterion and principal of effective stress,the elasto-plastic stress analysis method is established considering the seepage field in construction period and corresponding analytical formula is also presented.Firstly,plastic radius are resolved through trial or iteration method.Secondly,external press of tunnel is obtained,Thirdly,the stress and displacement of circular tunnel and surrounding rock is gained.An example is analyzed based on this method.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The circular tunnel is a common structure in civil engineering.It is assumed that all the influence factors surrounding circle tunnel are axially symmetrical,and interface of elastic and plastic regions is in surrounding rock.Applying Mohr-Coulomb yield criterion and principal of effective stress,the elasto-plastic stress analysis method is established considering the seepage field in construction period and corresponding analytical formula is also presented.Firstly,plastic radius are resolved through trial or iteration method.Secondly,external press of tunnel is obtained,Thirdly,the stress and displacement of circular tunnel and surrounding rock is gained.An example is analyzed based on this method.

Key concepts: Axial symmetry, Stress field, Structural engineering, Plasticity, Principal stress, Displacement (psychology), Stress (linguistics), RADIUS

Related papers

Back to paper searchBrowse research topicsOriginal source
Elasto-Plasticity of Circular Tunnel Consioering Seepaye Field in the Construction Period — Research Paper | ScholarLens